Unpacking the RBRglissando
The RBRglissando arrives in a crate, where all units are packed together. Each unit comes with a set of cables bundled together in a protective sleeve. When you order an RBR instrument at the same time, the case with the instrument will also be included inside the crate. Follow the steps below to unpack your winch.
|
Do not remove protective sleeves from bundled cables. |
Steps
-
Remove the top and walls of the crate.
-
Remove all the protective foam from the top and dispose of it responsibly.
-
Remove the case with the RBR instrument (if applicable), the box with the handheld remote control unit (1) help with red straps, and the support kit box (2) from behind the drum.
The support kit contains the Allen keys for opening up the drum and sheave units for line feeds, and other hardware as well as the key to the control cabinet.
-
Remove the straps:
-
two holding the bell mouth
-
one securing the cabinet
-
one from the drum
-
-
Remove the sheave unit from the pallet.
The sheave unit weighs 70kg. You need at least two people to lift it.
-
Identify a spot on the deck where you will install the control cabinet.
The control cabinet ships positioned on its side. It will need to be in the proper orientation for installation and connection.
-
Remove the control cabinet from the pallet and place it at the selected spot in the proper orientation, to prepare for connecting.
The control cabinet weighs 80kg. You need at least two people to lift it.
Do not cut the zip-ties from the cable and do not remove the bubble wrap from the connector until you are done positioning the cabinet and ready to connect.
-
Locate the key to the control cabinet inside the support kit box.
-
Open the control cabinet using the key and locate the fuse box.
-
Flip all the breakers on.
-
Close and lock the control cabinet.
The control cabinet should remain locked at all times. The only reason to open it would be to reset the breakers when they trip.
-
Identify a convenient spot on the deck in line with the A-frame to install the drum unit.
The drum unit ships with the motor oriented upwards. It will need to be in the proper orientation for installation and connection.
-
Remove the drum unit from the pallet and place it at the selected spot in the proper orientation, to prepare for mounting.
The drum unit weighs 170kg. You need at least four people to lift it.
Do not cut the zip-ties from the cable and do not remove the bubble wrap from the connector until you are done positioning the drum and ready to connect.