RBRoregano

RBRoregano

    • Getting started
      • Block diagram
      • Telemetry
      • Using the internal USB port
      • Using the RS-232 port
      • Prepare for deployment
      • Predeployment checklist
      • Retrieving data
      • Updating the instrument
    • Maintenance
      • Opening the instrument
      • Replacing batteries
      • Replacing the O-rings
    • Reference
      • Configuration files reference
      • Deployment behaviour
      • Diagnostic menu
        • config-check
        • diagnose
        • disable
        • edit-config
        • enable
        • help
        • mount-storage
        • reboot-controller
        • scrub-controller
        • scrub-instrument
        • status
        • transparent-link
        • unmount-storage
    • Repairs
    • Troubleshooting
      • GSM/LTE modem troubleshooting
RBRoregano
  • RBRoregano
  • RBRoregano
  • Getting started
  • Predeployment checklist

Predeployment checklist

  • Inspect O-rings. See Replacing the O-rings.

  • Replace the desiccant.

  • Replace the batteries with LiSOCL2 D-cells. See Replacing batteries.

  • Update the configuration with the correct parameters for the deployment. See Configuration files reference and Updating the instrument.

  • Perform a bench test with the instrument fully assembled. See Prepare for deployment.

  • Enable the instrument right before deploying. See enable.

  • Check that the instruments are logging. See status.

rbroregano · 5c89a17 · built 2026-09-16 01:24 +0000