Open and close the instrument
Remember to keep the O-ring clean and avoid scratching the O-ring mating surfaces. Carefully inspect the O-ring before deploying the instrument.
Opening the RBRduraturo4
Closing the RBRduraturo4
|
Fig. 2. The RBRduraturo4 with end-cap removed.
|